FROM SITE TO DETAIL
Our signature stays on the project long after the drawings leave the studio. We follow each one through construction — across time zones, seasons and sites — until it stands the way it was imagined.
From key construction stages to final installation, we stay involved in the decisions that shape the result. Working closely with contractors, suppliers and craftsmen, we protect the original vision and make sure every detail is carried through with precision.
Worldwide Supervision
The Amber Residence
Beijing, China
2025

The Coastal Residence
Gdańsk, Poland
2025

NOHO NADGÓRNIKÓW 14
Katowice, Poland
2025

Grace Hill Public Spaces
Beijing, China
2024
Grace Hill Apartments Collection
Beijing, China
2025

The Athletic Club
Beijing, China
2026
6 Projects
- Worldwide Supervision
Before construction begins, we establish clear standards for quality, communication, reporting and approvals. Every contractor understands what is expected, how decisions are made and how the work will be reviewed throughout the process.
Our role during construction is to provide creative and technical design support whenever the site requires it. We review solutions, clarify details and guide necessary adjustments so that execution remains aligned with the original concept.
We verify contractor and supplier documentation before execution, focusing on the details that directly affect the final result. The goal is to make sure technical solutions support the design rather than compromise it.
We review physical samples, mock-ups and key materials according to the approved design. Textures, finishes, special treatments, junctions and final material appearance are reviewed and approved by our team before implementation.
When construction requires changes, we adapt our drawings and design solutions accordingly — responding to new conditions without compromising the original design intent.
At the final stage, we review the completed space as a whole, identify any remaining adjustments and prepare a final list of comments. We stay involved through the last refinements to make sure the project is fully resolved before handover.
01
Site Kick-off & Standards
02
Remote & On-Site Presence
03
Shop Drawing Review & Verification
04
Sample & Material Approval
05
Necessary Project Modifications
06
Final Acceptance & Handover






hilight®
Building identities through space
There is no fixed frequency. Site visits are planned according to the construction programme and key project milestones, so our presence is concentrated around moments when important design decisions, approvals or adjustments need to be made.
Yes. We supervise projects internationally and work closely with local contractors, consultants and project teams. The scope and format of our supervision are adapted to each project’s location, complexity and construction schedule.
No. We do not replace the general contractor or project manager. Our role is to supervise the project from the designer’s perspective and support the team on all design-related decisions.
Yes. Supervision can be arranged as a separate service once the design phase is complete, with the scope and frequency defined according to the project.
Yes. We have contractors and specialists we already know and have worked with across previous projects. Working with familiar teams can make the process smoother, as they already understand our standards, level of detailing and way of working. However, we are equally comfortable working with the client’s own contractors and local teams.

Yevhen Zahorodnii
Founder & Chief Architect
Yevhen Zahorodnii
GREAT ARCHITECTURE IS NEVER THE RESULT OF A SINGLE DECISION. IT IS THE OUTCOME OF THOUSANDS OF THOUGHTFUL CHOICES, A SHARED VISION AND A TEAM THAT BELIEVES IN WHAT IT CREATES. I BUILT HILIGHT AROUND THIS PRINCIPLE — THAT EVERY PROJECT DESERVES OUR FULL COMMITMENT, FROM THE FIRST CONVERSATION TO THE VERY LAST DETAIL.